View printable render

STAGES

Stage 1 18,000 SQ. FT. VIEW STAGE
Stage 2 20,300 SQ. FT. VIEW STAGE
Stage 3 19,750 SQ. FT. VIEW STAGE
Stage 4 19,000 SQ. FT. VIEW STAGE
Stage 5 and 6 42,000 SQ. FT. VIEW STAGE
Stage 7 11,500 SQ. FT. VIEW STAGE
Stage 8 12,200 SQ. FT. VIEW STAGE
Stage 9 17,500 SQ. FT. VIEW STAGE
Stage 10 17,500 SQ. FT. VIEW STAGE
Stage 11 and 19 35,000 SQ. FT. VIEW STAGE
Stage 12 17,500 SQ. FT. VIEW STAGE
Stage 13 and 17 35,000 SQ. FT. VIEW STAGE
Stage 14 7,900 SQ. FT. VIEW STAGE
Stage 15 8,300 SQ. FT. VIEW STAGE
Stage 16 8,500 SQ. FT. VIEW STAGE
Stage 18 15,600 SQ. FT. VIEW STAGE
Stage 20 16,620 SQ. FT. VIEW STAGE
Stage 21 16,400 SQ. FT. VIEW STAGE
  • Overview
  • Location
  • Technical
  • Environment
  • Gallery

Opened Summer 2025

Lake City Studios offers 21 purpose built soundstages on 18.5 acres; 30 minutes from downtown Vancouver and 35 minutes from YVR airport.

 

Sound Stages
  • Five 50’ high sound stages ranging from 18,000 to 26,500 sf
  • Eight 40’ high sound stages all approximately 17,000 sf
  • Three 35’ high sound stages ranging from 7,900 to 8,500 sf
  • Two 30’ high sound stages ranging from 11,500 to 12,200 sf
  • Stages 5/6 combined is almost an acre in size and 50 ft. high (42,442 sf)
  • Laser-flat concrete floors are topped with a layer of wood for set fastening and enhanced acoustics
  • All stages have catwalks
  • Each roof truss is capable of handling 15,000 pounds, even if there’s two feet of snow on the roof
Support spaces
  • Level P1B – Seven mill shops ranging from 8,000 – 10,000 sf connected to stages via forklift ramps
  • Level 2 – Seven props lock ups 5,000 sf each connected to stages via freight elevators
  • Level P1B – Set dec lock ups 5,000 – 7,000 sf connected to stages via ramps
  • 5,000 lb capacity freight elevators
Offices
  • Level 2&3 – Costumes/wardrobe 5,000 sf each
  • Level 1&2 – Eight individual production offices
Lighting/Grip
  • 75,000 sf lighting and grip facility – powered by MBS Equipment Company (MBSE)

Parking
  • Crew parking of 1,000 vehicles
  • Base camp, hair & make-up, wardrobe truck parking is 5,500 lineal feet
  • 200 EV (electric vehicle) charging ports
Security
  • Site is alarmed, monitored, and has closed circuit 24/7 video surveillance
  • Entry controlled by card access (personnel and vehicular)
  • Records all entries/exits of the site and each main door in the facility
  • Closed circuit surveillance cameras throughout the site monitors all activities

  • Bridge Studios is proud to commit to making Lake City Studios a 100% Fossil Fuel Free Facility.
  • For more information on our commitment, please view the ‘Environment’ tab.

 

Central location within the Vancouver / Lower Mainland region.

3333 Lake City Way, Burnaby, BC, V5A 3A3 – View Google Map

HVAC
  • Office HVAC system provided with state-of-the-art Variable Refrigeration Flow  ( VRF) system utilizing internal energy recovery. VRF is a fossil fuel free system with the latest industry technology providing the highest comfort level and performance with the least amount of energy cost.
  • Sound Stages are heated and air-conditioned utilizing Heat Pump Technology & Heat Recovery.  The Heat Pump ERV system is a fossil fuel free system utilizing the latest industry technologies providing the highest performance with the least operational cost. All sound stages are controlled via state-of-the-art BAS (Building Automation System) to optimize the HVAC system performance and energy while providing additional comfort for the occupants.
Sound/Acoustics
  • Exceptional soundproofing for control of all exterior sounds
  • Clear span soundstages are constructed from 9 1/2″ thick concrete exterior walls and STC 70 interior demising walls
  • Max interior noise level of 25 dBA (NC 20) weighted decibels
  • Interior walls and ceiling are lined with Insul-Quilt sound absorbing insulation for optimum room acoustics
Connectivity/Internet
  • Wi-fi 6 connectivity throughout stages, support and office spaces
  • Redundant, burstable up to 10Gbps internet connectivity
  • 10Gpbs fiber optic network throughout site
  • VoIP phone system
Electrical
  • Relying on 100% renewable BC Hydro electricity
  • Separate dimmer rooms for each stage
  • Each stage has 4 x 400 amp switches for 1,600 amps each
  • LED lighting throughout facility
  • Low light stumble lights in stage for safe exiting
  • Emergency lighting in grid to allow safe exit/egress for all crew should the power go out
  • Each stage has 4 x 400 amp contactor switched camlocks
  • 1 contactor is located on the stage floor
  • 3 contactors are located in the stage specific dimmer rooms
Bell & Light System
  • Director control system with multiple wall jacks on each of the 4 walls with 100 ft cable to control bell, lights and HVAC system shutdowns

 

Bridge Studios is proud to commit to making Lake City Studios a 100% Fossil Fuel Free Facility.

 

Commitment
  • The entire site is designed to achieve the highest standards of sustainability and environmental responsibility.
  • The facility uses absolutely No Fossil Fuels and is completely powered by Electricity.
  • In British Columbia electricity is 100% generated by Hydro Power, meaning it’s 100% clean and renewable.
  • The separate waste/recycling building is designed to make recycling easy and reducing the waste generated by the site. Plastic, paper, glass, metal, and organics can all be separated.
Technical
  • Man lifts, forklifts, and golf carts are primarily battery-operated.
  • 35 of the personal vehicle parking spots have 220v EV plug ins.
  • Electrical hook-ups for Base Camp trailers to plug right in.
  • HVAC VRF (Variable Refrigerant Flow) system uses NO fossil fuels.
  • LED lighting throughout facility.

 

Various renders & photos of Lake City Studios.
Click to view